Quantity Surveying Building Estimation In Detail.

Published 2022-05-25
Platform Udemy
Rating 4.00
Number of Reviews 1
Number of Students 23
Price $24.99
Subjects

Go to Udemy

Quantity Surveying , Building Estimation , Bar Bending Schedule and Rate Analysis in detail.

Quantity Surveying/Building Estimation Complete Course(45 Hours Training)

Estimation Of Commercial Building (Basement Floor+ Ground Floor+ First Floor+ Second Floor+ Mumty)

Estimation With The Help Of Two Software

1. Autocad For AutoCAD Drawings

2. Plan Swift For PDF Drawings

Estimation In Two Systems

(F.P.S) Mean Feet And Inches.

(M.K.S) Mean Meter And Millimeter.

Let's Look at Some Of the Important Lectures That We Will Cover In This Course:

Excavation Works (Feet And Inches)

· Important Points Before Doing Excavation.

· Quantity Of Excavation For Basement.

Estimation For P.C.C And Waterproofing (Feet And Inches)

· Quantity Of P.C.C For Septic Tank And Raft Foundation.

· Quantity of Waterproofing In the Septic Tank And Basement.

R.C.C Works In Septic Tank And Basement (Feet And Inches)

· Quantity Of R.C.C In Septic Tank.

· Quantity Of R.C.C In Basement.

Retaining Walls In Basement (Feet And Inches)

· Formwork Quantity For Retaining Walls In Basement.

· Concrete Quantity For Retaining Walls In Basement.

Columns In Basement (Feet And Inches)

· Formwork For Different Columns In Basement.

· Concrete Quantity For Columns In Basement.

Beams In Basement (Feet And Inches)

· Formwork Quantity For Different Beams In Basement.

· Concrete Quantity For Beams In Basement.

Stairs And Slab In Basement (Feet And Inches)

· Formwork Quantity For Stairs And Slab In Basement.

· Concrete Quantity For Stairs And Slab In Basement.

Columns Beam Stairs And Slab For Typical Floors (Feet And Inches)

· Quantity Of Formwork For Columns In G.F Or Typical Floors.

· Quantity Of Concrete For Columns In G.F Or Typical Floors.

· Quantity Of Formwork For Beams In G.F Or Typical Floors

· Quantity Of Concrete For Beams In G.F Or Typical Floors.

· Quantity Of Formwork For Stairs And Slab, G.F or Typical Floors

· Quantity Of Concrete For Stairs And Slab, G.F or Typical Floors

Brick Works (Feet And Inches)

· Quantity Of Brick Works In Basement.

· Typical Floor Brick Works.

· Parapet Wall Brick Works.

Plaster Works (Feet And Inches)

· Quantity Of Plaster Works In Basement.

· Typical Floor Plaster Works Works.

Marble And Tile Works (Feet And Inches)

· Marble And Tile Works In G.F And Typical Floors.

Paint Works (Feet And Inches)

· Paint Works In Basement and Ground:

Bar bending Schedule Basics (Feet And Inches)

· Some Of Basics Of B.B.S.

· How to Do Bend Deductions For Different Angles.

· How to Find Cut Length OF Main And Distribution Bars.

· Overlapping.

· Cut Length Of Bent up Or Crank Bar.

· Cut Length Of Rectangular, Triangular, Diamond And Circular Stirrups.

· Cut Length Of Chair Bars.

· Cut Length Of 4 or 6 Legged Stirrups.

Bar Bending Schedule Excel Sheet (Feet And Inches)

· Introduction To B.B.S Excel Sheet.

· How to Do Formatting In B.B.S Sheet.

Bar Bending Schedule For Septic Tank (Feet And Inches)

· Understanding Reinforcement Detail In Septic Tank.

· B.B.S For Septic Tank Bed.

· B.B.S For Septic Tank Walls.

· B.B.S For Septic Tank Slab.

Bar Bending Schedule For Footing (Feet And Inches)

· Footing Reinforcement Detail:

· B.B.S For Raft Foundation:

Bar bending Schedule For Different Columns (Feet And Inches)

· B.B.S For Different Column Like C1,C2,C3,C4,C5.

Bar Bending Schedule For Retaining Walls (Feet And Inches)

· B.B.S For Retaining Walls Basement In Detail.

Bar Bending Schedule For Beams (Feet And Inches)

· Bar Bending Schedule For Beams B01, B02, B03, B04, B05………In Detail.

Bar Bending Schedule For Slab (Feet And Inches)

· Bar Bending Schedule For Slab In Basement And Typical Floor.

Bar Bending Schedule For Stairs (Feet And Inches)

· Bar Bending Schedule For Straight And Spiral Stairs In Detail.

Rate Analysis For Different Works (Feet And Inches)

· Rate Analysis For Excavation (Manual And In Excel)

· Rate Analysis For P.C.C (Manual And In Excel)

· Rate Analysis For R.C.C (Manual And In Excel)

· Rate Analysis For Brick Works (Manual And In Excel)

· Rate Analysis For Plaster Works (Manual And In Excel)

· Rate Analysis For Tile Works (Manual And In Excel)

· Rate Analysis For Paint Works (Manual And In Excel)

Plan Swift Beginners Training :

· Training For Those We Are Completely Beginners In Plan Swift.

Excavation Quantity In Plan Swift (Meter And Millimeters)

· Importing Job In Plan Swift

· Excavation For Basement And Septic Tank:

P.C.C And Waterproofing In Plan Swift (Meter And Millimeters)

· P.C.C For Basement And Septic Tank.

· Water Proofing For Basement And Septic Tank.

Concrete Work In Basement And Septic Tank (Meter And Millimeters)

· Conc For Basement And Septic Tank Base.

· Formwork Quantity In Septic Tank.

· Concrete In Septic Tank Walls And Basement.

Retaining Walls (Meter And Millimeters)

· Formwork For Retaining Walls.

· Concrete For Retaining Walls.

Columns (Meter And Millimeters)

· Formwork For Columns

· Concrete For Columns

Beams Slab And Stairs (Meter And Millimeters)

· Formwork For Beams Slab And Stairs.

· Concrete For Beams Slab And Stairs.

Brick Works (Meter And Millimeters)

· Brick Works In Basement.

Plaster Works (Meter And Millimeters)

· Plaster Works In Basement.

Marble Works (Meter And Millimeters)

· Marble Works In Basement

Bar bending Schedule Basics (Meter And Millimeters)

· Some Of Basics Of B.B.S.

· How to Do Bend Deductions For Different Angles.

· How to Find Cut Length OF Main And Distribution Bars.

· Overlapping.

· Cut Length Of Bent up Or Crank Bar.

· Cut Length Of Rectangular, Triangular, Diamond And Circular Stirrups.

· Cut Length Of Chair Bars.

· Cut Length Of 4 or 6 Legged Stirrups.

Bar Bending Schedule For Footing (Meter And Millimeters)

· Footing Reinforcement Detail:

· B.B.S For Raft Foundation:

Bar bending Schedule For Different Columns (Meter And Millimeters)

· B.B.S For Different Column Like C1,C2,C3,C4,C5.

Bar Bending Schedule For Retaining Walls (Meter And Millimeters)

· B.B.S For Retaining Walls Basement In Detail.

Bar Bending Schedule For Beams (Meter And Millimeters)

· Bar Bending Schedule For Beams B01, B02,

Bar Bending Schedule For Slab (Meter And Millimeters)

· Bar Bending Schedule For Slab In Basement.

Rate Analysis For Different Works (Meter And Millimeters)

· Rate Analysis For Excavation (Manual And In Excel)

· Rate Analysis For P.C.C (Manual And In Excel)

· Rate Analysis For R.C.C (Manual And In Excel)

· Rate Analysis For Brick Works (Manual And In Excel)

· Rate Analysis For Plaster Works (Manual And In Excel)

· Rate Analysis For Tile Works (Manual And In Excel)

· Rate Analysis For Paint Works (Manual And In Excel)

Excel Training For Beginners.

· Excel Training For Those Who Are Beginners In Excel (Important)

AutoCAD Training For Beginners.

· AutoCAD Training For Those Who Are Completely Beginners In AutoCAD (Important)

Go to Udemy